Owner BuilderWAPlan · Source · Build to lock-up

Four defined engagement stages

Know what you receive, who is responsible and where each stage ends

Owner Builder WA can review project fit, prepare the preconstruction plan, coordinate procurement and deliver an agreed structural-shell or lock-up package. Each proposal defines the deliverables, responsibilities, fee basis, timing, exclusions and handover point before work begins.

Residential construction materials prepared for an agreed structural work package

Stage 01

Project Fit Review

Initial consultation, eligibility review, risk identification and a recommended pathway.

What you receive

  • A discussion covering your project goals, site and budget expectations
  • An initial review of whether the owner-builder pathway and available support fit your circumstances
  • A summary of material site, regulatory and budget risks identified from the information supplied
  • A recommended next step before you commit to a broader engagement

What we undertake

  • Reviews your brief, site details and preliminary requirements
  • Tests whether the proposed construction and procurement pathway is a practical fit
  • Flags information, reports or decisions needed before preconstruction planning

What remains with you

  • Deciding whether to proceed
  • Obtaining independent legal, financial and insurance advice
  • Supplying accurate project information and arranging any recommended investigations

Exclusions

  • Detailed cost plans or construction programmes
  • Site surveys, engineering or geotechnical reports
  • Legal, financial or insurance advice
  • Owner-builder applications and approvals

Fee basis and timing

Fee basis: Any review fee, credit arrangement or no-charge consultation is confirmed in writing before the appointment. No fee basis is assumed from this website.

Timing: Timing is confirmed after the information available for review is understood.

Stage 02

Preconstruction Plan

A responsibility matrix, approvals schedule, preliminary cost plan, procurement schedule and construction programme.

What you receive

  • A responsibility matrix separating your role, Owner Builder WA’s role and licensed-contractor work
  • An approvals schedule aligned with project and authority milestones
  • A preliminary cost plan with the scope and calculation basis of fees documented
  • A procurement schedule and construction programme connecting trades, inspections and cash flow

What we undertake

  • Prepares the agreed planning documents
  • Coordinates planning inputs with your appointed designer and consultants
  • Sets up the working programme and agreed reporting process
  • Documents fee calculations before the stage begins

What remains with you

  • Appointing and paying your designer, engineer and other consultants unless separately agreed
  • Lodging and paying for authority applications and approvals
  • Arranging finance and insurance
  • Approving the plan while retaining your statutory owner-builder obligations

Exclusions

  • Architectural and engineering design unless separately engaged
  • Authority fees and contributions
  • Finance or insurance arrangement
  • Physical site and construction work

Fee basis and timing

Fee basis: The planning fee and its calculation basis are stated in the written proposal and accepted before work begins.

Timing: The programme is set after the project information, consultant inputs and approval pathway have been reviewed.

Stage 03

Procurement & Supply

Defined products, disclosed landed costs, an agreed mark-up, delivery responsibility and warranty arrangements.

What you receive

  • A defined specification for products and materials within the accepted procurement scope
  • Open-book disclosure of underlying and landed costs
  • A separately stated, agreed coordination mark-up
  • Documented delivery and warranty responsibilities

What we undertake

  • Sources agreed products through local and import supply channels
  • Coordinates shipping, transport and delivery to the agreed point
  • Where practical, obtains multiple quotes for applicable non-structural and smart-home items
  • Records warranty information and interfaces with the construction programme

What remains with you

  • Approving each procurement commitment
  • Paying supplier invoices under the accepted commercial terms
  • Providing site access and agreed storage arrangements
  • Accepting responsibility for independently sourced items while coordinating their integration

Exclusions

  • Items outside the accepted procurement scope
  • Warranty for client-sourced products
  • Unagreed storage
  • Duties, GST and government charges other than as disclosed pass-through costs

Fee basis and timing

Fee basis: Procurement is open-book and cost-plus. The underlying cost and agreed coordination mark-up are disclosed separately before commitment.

Timing: Lead times depend on the accepted specification, supplier availability, import requirements and project programme and are documented before ordering.

Stage 04

Structural Shell / Lock-up Delivery

Exact inclusions, labour basis, inspections, handover documents and the point at which you take over.

What you receive

  • A defined structural-shell or lock-up work package before construction begins
  • An estimate setting out anticipated labour, materials and associated costs
  • Recorded labour and progress visibility under the accepted commercial terms
  • Inspection, warranty and handover records for the completed package
  • A clearly documented handover point

What we undertake

  • Provides SIP-panel-experienced carpentry for the agreed structural package
  • Coordinates supervision, specialist trades and inspections included in the written scope
  • Records site activity through the construction portal as work occurs
  • Seeks approval before material changes to the agreed scope or budget proceed

What remains with you

  • Approving the work package and material changes
  • Controlling the project budget and work outside the accepted package
  • Engaging trades and suppliers outside the written scope
  • Retaining all statutory owner-builder responsibilities

Exclusions

  • Fit-out and external works beyond the accepted package
  • Client-sourced trades and materials outside the scope
  • Authority fees and inspection charges unless expressly included
  • Remediation of undisclosed or pre-existing site conditions

Fee basis and timing

Fee basis: Labour rates, project-management fees and the work-package estimate are documented and accepted before construction begins.

Timing: The construction period is set in the accepted programme after design, approvals, site conditions, scope and supply lead times are known.

Clear boundaries from the start

One project can use one stage—or a deliberately connected sequence.

Every accepted proposal identifies what you are managing, what Owner Builder WA is supplying or coordinating, what licensed contractors perform and the exact handover point. Your owner-builder obligations remain yours.